      Tonzo ppr quickly install the elevator base is listed in March

      2017-03-30
      Product pictures
       

      At the time of installation, a elevator base is installed at 1 m per interval.

      As shown in the figure below:

      Each hanger can be up to 600N.

      It's about 4.8 N per meter in full water,

      600N>>>>>>4.8N。



      Ensure the quality of the products is stable while ensuring the speed of installation.